Skip to main content

Bathroom Remodeling in Columbus, Ohio

One Contractor. One Schedule. One Room You Actually Like.

Tub, shower, vanity, tile, lighting and floor, handled as a single project. Most bathrooms finish in two to six weeks on site.

4.9 from 53 Google reviews

(614) 931-0802
Full bathroom remodel in Blacklick with a freestanding slipper tub beneath a window, botanical wallpaper, polished nickel sconces and a white vanity with quartz top

Bathroom remodeling is the coordinated replacement of the fixtures, tile, cabinetry, lighting and flooring in a bathroom as a single project, with one contractor holding the schedule and running every trade.

Installing a vanity is the easy part. The hard part of a bathroom is that a plumber, an electrician, a tile setter, a glass company and an inspector all have to arrive in the right order, and a slip anywhere in that chain can cost a week. We hold that schedule, so there is one company to call rather than five.

What a Full Bathroom Remodel Includes

  • Design, product selection and a written quote before any work begins
  • Permits pulled and inspections scheduled and passed
  • Demolition and disposal, with the work area protected and dust contained
  • Plumbing and electrical rough-in, including any fixture relocations
  • Waterproofing, tile, and the shower or tub surround
  • Vanity, countertop, sink, faucet, toilet and mirror
  • Lighting, exhaust ventilation and any heated flooring
  • Flooring, paint, trim and glass
  • A final walkthrough before the balance is invoiced

How the Project Runs

  1. Consultation and measure. A designer comes to the house, measures the room, looks at what is under the floor and behind the walls where we can, and talks through what you want the room to do. You leave with a written quote.
  2. Design and selections. Either a Collection adjusted to your taste or a fully custom design. Everything gets specified and ordered. This takes four to six weeks and is the part that sets the start date.
  3. Demolition and rough-in. The room comes out, the plumbing and electrical go in, and the inspector signs off before anything gets covered.
  4. Waterproofing and tile. The wet areas get fully waterproofed, then tiled. This is the longest stretch of the on-site time and the part that determines whether the bathroom is still sound in twenty years.
  5. Fixtures and finishes. Vanity, countertop, toilet, lighting, mirror, flooring, paint and trim.
  6. Glass and walkthrough. Glass is templated against the finished walls and installed when it arrives. Then we go through the room together and fix anything on the list before we invoice the balance.

What Affects the Cost of a Bathroom Remodel

Your written quote is built around your room, your layout and the finishes you choose. What moves the number:

  • Whether plumbing moves. Keeping the toilet, tub and vanity where they are is dramatically cheaper than relocating them, and over a concrete slab the gap is wider still.
  • Room size and tile area. Tile is priced by the square foot in both material and labor, and a floor-to-ceiling tiled shower is a lot of square feet.
  • Tub and shower, or one or the other. A primary suite with a freestanding tub and a separate walk-in shower is two wet areas to waterproof, plumb and finish.
  • Fixture and material grade. The spread between a solid mid-range vanity and a custom cabinet with a stone top is thousands, and it is entirely your call.
  • Extras that are cheap now and expensive later. Heated floors, blocking for grab bars and additional circuits cost little while the walls and floor are open.

Curated Collections, or Fully Custom

The single biggest reason bathrooms never get updated is not money, it is the number of decisions. Our designers assemble Collections: sets of tile, flooring, vanity, countertop and finishes that already work together. You choose the one you like and adjust it, which turns hundreds of decisions into a handful. If you arrive with a clear vision and reference images, we design to that instead and specify to the last detail. Both routes end at the same place, which is a written quote and a room you have already seen.

Which Project You Actually Need

A full remodel is not always the right answer, and the consultation is where we work that out honestly:

Where two of those are true at once, doing them as one project almost always costs less than doing them as two, because the demolition, the protection and the trade scheduling only happen once.

Remodel Now, Pay Over Time

Third-party lending partners offer competitive financing on most projects, so you can start the work now and keep your savings where they are. Ask about the options during your consultation.

Subject to credit approval and our third-party financing partners' guidelines. Not all consumers will qualify. Financing offerings vary by franchise location and may not be available in all areas. Ask your consultant for details.

Proof

A look at the work. Full remodels, tub-to-shower conversions, bathtub replacement and walk-in showers.

  • Columbus bathroom remodel with a freestanding soaking tub, matte black floor-mounted filler and a frameless glass walk-in shower over wood-look plank flooring
    Columbus bathroom remodel with a freestanding soaking tub, matte black floor-mounted filler and a frameless glass walk-in shower over wood-look plank flooring
  • Freestanding slipper tub beneath a window on a botanical wallpaper accent wall, flanked by polished nickel sconces and framed art
    Freestanding slipper tub beneath a window on a botanical wallpaper accent wall, flanked by polished nickel sconces and framed art
  • Walk-in shower in a Blacklick bathroom remodel, tiled in grey subway with a frameless glass door and polished nickel fixtures
    Walk-in shower in a Blacklick bathroom remodel, tiled in grey subway with a frameless glass door and polished nickel fixtures
  • Primary bathroom looking down the room to a freestanding tub under a wallpapered window wall, over a white marble hexagon tile floor
    Primary bathroom looking down the room to a freestanding tub under a wallpapered window wall, over a white marble hexagon tile floor
  • Blacklick bathroom remodel seen past the shower glass, with a white quartz-topped vanity, a freestanding tub and a bronze tile shower wall
    Blacklick bathroom remodel seen past the shower glass, with a white quartz-topped vanity, a freestanding tub and a bronze tile shower wall
  • Westerville bathroom remodel with a frameless glass walk-in shower, marble-look wall tile, matte black fixtures and a white vanity with charcoal quartz
    Westerville bathroom remodel with a frameless glass walk-in shower, marble-look wall tile, matte black fixtures and a white vanity with charcoal quartz

Reviews

What Remodel Clients Say

Rated 4.9 out of 5 across 53 Google reviews. Each quote below is an excerpt in the reviewer's own words, and the full text of every one is on the profile.

4.9

53 reviews

  • “We could not be more pleased with Bath Tune Up. Matt, Scott and the crew were meticulous in their work. The project came in on time, at a price we were happy with and came out better than we expected.…”

    Diane Hageman

    Bathroom Remodeling · 4 months ago · Google

  • “My bathroom renovation experience with Bath Tune-Up was excellent from start to finish. The team immediately understood my vision and guided me through the design process with so much knowledge and care.…”

    Jenny Robinson

    Bathroom Remodeling · a year ago · Google

  • “My bathroom project was a full gut and remodel. Sherri (sales associate) was very professional, informative, flexible, patient, kind and fun.…”

    Julie

    Bathroom Remodeling · 7 months ago · Google

FAQ

Questions We Hear Most

How much does a bathroom remodel cost in Columbus?

It depends on the size of the room, the finishes and whether the layout changes. A hall bath or guest bath with the layout kept as-is costs the least. A primary bathroom with a freestanding tub, a separate walk-in shower, a double vanity and heated floors costs the most. Layout changes that move plumbing are the single largest cost jump. Your designer measures the room at a free consultation and leaves you with a written quote.

How long does a bathroom remodel take?

Two to six weeks on site for most bathrooms, plus four to six weeks of design and ordering before we start. The on-site clock runs: demolition, plumbing and electrical rough-in, inspection, waterproofing, tile, then fixtures and finishes. Glass is templated against the finished walls and arrives three to four weeks later, so it usually lands just after the rest is done.

Will I be without a bathroom the whole time?

The bathroom being remodeled is out of service for the full run. Every other bathroom in the house stays usable throughout. We protect the path from the door to the work area, contain dust at the doorway, and clean up at the end of every working day. If the bathroom being remodeled is the only one in the house, tell us at the consultation so we can sequence the work to shorten that window.

Do I need permits to remodel a bathroom?

Usually yes, and we pull them. Columbus and the surrounding jurisdictions require permits once plumbing or electrical work is involved, which is nearly every full remodel. Like-for-like fixture swaps sometimes do not. Permits mean inspections, and inspections mean a day or two in the schedule, which is already built into the timeline we quote you.

Can you move the toilet, tub or shower?

Yes, though it is the decision that moves the price most. Relocating a toilet means moving a three-inch drain line and a vent, which over a joisted floor is manageable and through a concrete slab means cutting and patching. Sometimes moving one fixture eighteen inches is what makes a cramped bathroom finally work, and it is worth the cost. Your designer prices it both ways so you can decide with the number in front of you.

What is the Collections process?

The Collections are pre-assembled sets of tile, flooring, vanity, countertop and fixture finishes that our designers have already checked against each other. You pick a Collection you like and adjust from there, rather than starting with an empty room and every product in the world available. Most people choose this route. If you already have a Pinterest board and a clear vision, we design fully custom instead.

Do you handle the plumbing and electrical, or do I hire those?

We handle everything. One contract, one schedule, one person you call. The licensed plumbers and electricians on the job are ours to coordinate, and the permits and inspections are ours to pull and pass. You are not managing three trades against each other or waiting for someone else to show up before we can carry on.

What happens if you find water damage behind the wall?

On a bathroom that has been leaking quietly for years, it happens. We stop, photograph it, price the repair and bring you options before we proceed. It goes on the invoice as its own line, never absorbed silently into the original quote and never done without your sign-off. Rotten subfloor and failed framing get repaired properly before anything decorative goes back over them.

Service Area

Where We Work in Central Ohio

We cover Columbus and the surrounding suburbs. This franchise is responsible for the cities below, plus 67 ZIP codes listed at the bottom of this page.

  • Columbus
  • Dublin
  • Westerville
  • Powell
  • New Albany
  • Lewis Center
  • Amlin
Check your ZIP code

43001, 43002, 43004, 43013, 43015, 43016, 43017, 43018, 43021, 43026, 43031, 43032, 43033, 43035, 43036, 43040, 43054, 43061, 43062, 43064, 43065, 43066, 43068, 43074, 43077, 43081, 43082, 43085, 43109, 43110, 43119, 43123, 43125, 43126, 43136, 43137, 43147, 43201, 43202, 43203, 43204, 43205, 43206, 43207, 43209, 43210, 43211, 43212, 43213, 43214, 43215, 43216, 43217, 43219, 43220, 43221, 43222, 43223, 43224, 43227, 43228, 43229, 43230, 43231, 43232, 43235, 43240

Other Options

Considering the Other Options?

Here are the other three routes. Your designer works out which one suits the room, then prices the alternatives so you can compare them side by side.

Shower Conversions

The tub comes out and a walk-in shower goes in the same footprint. It is the job we get called about most, and you get the floor space back.

Timeline
1 to 2 weeks on site

Bathtub Replacement

We pull the old tub and set a new soaking, freestanding or alcove tub in its place, replacing the surround and valve while the wall is open.

Timeline
1 to 2 weeks on site

Shower Installation

We build the shower from the waterproofing up, then set the glass, valve and drain before we leave. Tile or solid surround, your choice.

Timeline
2 to 5 days on site

Start With a Free In-Home Consultation

A designer comes to you, measures the room, talks through your options and what each one costs, and leaves you with a written quote. It takes about an hour and it costs nothing.

  • One visit, and you keep the written quote
  • No deposit, and no obligation to book the work
  • Financing options covered while we’re there

Prefer to talk first?

(614) 931-0802

Monday to Friday, 8am to 5pm. Saturdays by appointment.

Request Your Consultation

Tell us how to reach you and we’ll call to schedule a time that works.

We’ll call or text the number you provide to schedule. Your information is used to schedule and follow up on your consultation. See our privacy policy for details.

A free in-home consultation and a written quote you keep, whatever you decide next.

Call Now Free Quote