Shower Conversions
The tub comes out and a walk-in shower goes in the same footprint. It is the job we get called about most, and you get the floor space back.
- Timeline
- 1 to 2 weeks on site
Tub, shower, vanity, tile, lighting and floor, handled as a single project. Most bathrooms finish in two to six weeks on site.
4.9 from 53 Google reviews
Locally owned in Columbus
Bathroom remodeling is the coordinated replacement of the fixtures, tile, cabinetry, lighting and flooring in a bathroom as a single project, with one contractor holding the schedule and running every trade.
Installing a vanity is the easy part. The hard part of a bathroom is that a plumber, an electrician, a tile setter, a glass company and an inspector all have to arrive in the right order, and a slip anywhere in that chain can cost a week. We hold that schedule, so there is one company to call rather than five.
Your written quote is built around your room, your layout and the finishes you choose. What moves the number:
The single biggest reason bathrooms never get updated is not money, it is the number of decisions. Our designers assemble Collections: sets of tile, flooring, vanity, countertop and finishes that already work together. You choose the one you like and adjust it, which turns hundreds of decisions into a handful. If you arrive with a clear vision and reference images, we design to that instead and specify to the last detail. Both routes end at the same place, which is a written quote and a room you have already seen.
A full remodel is not always the right answer, and the consultation is where we work that out honestly:
Where two of those are true at once, doing them as one project almost always costs less than doing them as two, because the demolition, the protection and the trade scheduling only happen once.
Third-party lending partners offer competitive financing on most projects, so you can start the work now and keep your savings where they are. Ask about the options during your consultation.
Subject to credit approval and our third-party financing partners' guidelines. Not all consumers will qualify. Financing offerings vary by franchise location and may not be available in all areas. Ask your consultant for details.
Proof
A look at the work. Full remodels, tub-to-shower conversions, bathtub replacement and walk-in showers.
Reviews
Rated 4.9 out of 5 across 53 Google reviews. Each quote below is an excerpt in the reviewer's own words, and the full text of every one is on the profile.
4.9
53 reviews
“We could not be more pleased with Bath Tune Up. Matt, Scott and the crew were meticulous in their work. The project came in on time, at a price we were happy with and came out better than we expected.…”
“My bathroom renovation experience with Bath Tune-Up was excellent from start to finish. The team immediately understood my vision and guided me through the design process with so much knowledge and care.…”
“My bathroom project was a full gut and remodel. Sherri (sales associate) was very professional, informative, flexible, patient, kind and fun.…”
FAQ
Service Area
We cover Columbus and the surrounding suburbs. This franchise is responsible for the cities below, plus 67 ZIP codes listed at the bottom of this page.
43001, 43002, 43004, 43013, 43015, 43016, 43017, 43018, 43021, 43026, 43031, 43032, 43033, 43035, 43036, 43040, 43054, 43061, 43062, 43064, 43065, 43066, 43068, 43074, 43077, 43081, 43082, 43085, 43109, 43110, 43119, 43123, 43125, 43126, 43136, 43137, 43147, 43201, 43202, 43203, 43204, 43205, 43206, 43207, 43209, 43210, 43211, 43212, 43213, 43214, 43215, 43216, 43217, 43219, 43220, 43221, 43222, 43223, 43224, 43227, 43228, 43229, 43230, 43231, 43232, 43235, 43240
Other Options
Here are the other three routes. Your designer works out which one suits the room, then prices the alternatives so you can compare them side by side.
The tub comes out and a walk-in shower goes in the same footprint. It is the job we get called about most, and you get the floor space back.
We pull the old tub and set a new soaking, freestanding or alcove tub in its place, replacing the surround and valve while the wall is open.
We build the shower from the waterproofing up, then set the glass, valve and drain before we leave. Tile or solid surround, your choice.
A designer comes to you, measures the room, talks through your options and what each one costs, and leaves you with a written quote. It takes about an hour and it costs nothing.
Tell us how to reach you and we’ll call to schedule a time that works.
A free in-home consultation and a written quote you keep, whatever you decide next.